This week was successful.
What had happened this week was that first of all we had received our first
draft feedback on the film and it was positive and they had liked the initial
draft of the film, the only changes that we had been asked to do was the
duration of the back section to be shorter and the levels of the sounds on the
date scene. We had also been told a idea on how the first could be structured
was we had been told that what if the last sense of the short film could be
placed as the first sense, we had implied this opinion and had previewed it and
had like the outcome much better than the first structure. we then had created
the final cut of the film and liked the structure of the outcome of it and had
rendered and uploaded it at 1080p and 25fps as the standard film.
Challenges that we had
faced this week was that we had an intendent occurred the music that we had
original said that we wanted to be include into the date scene was non
copyright music we had then later seen that the music was copyright this was
show when we had seen that the YouTube notice that the music was copyrighted
and was unable to play the video so we had to go back to editing and change the
music to a non-copyright music.
We do not have a target for
next week was we have completed out short film and made the final cut of the
film and we have final the final projection of the film.
We had a team meeting
throughout this week while we were editing the final cut of the short film. We
had discussed the structure of the short film and had taken the idea of placing
the last scene first and we both had agreed that it had made the short film so
much better and it started and ended with the audience of feeling hopeful for
the character.
The team performance for this week was effective to the
short film in a positive because we had finished the final cut of the film
before the week had finished. The editor that we had was quick to make any
changes that we were told that could be improved and the director had agreed to
the improvement and had supported the idea and the editor to make the changes.
Contingency that we had used this week was that we had come
across a problem that one piece of the music that we had used was copyrighted,
so we had to go towards our contingency and replace the music. Were we had seen
this problem was when we had uploaded the cut of the film to YouTube and had
got a copyright notice.
We had previewed the short film many time to see if there
were any error with the footage, or if there was sound of a cut out of place,
we had did this throughout and had did it multiple times when we had moved the
last scene around to see if there was an error occurred. The final cut was
shown on full screen as we was going to render and uploaded it for out audience
to see.
The only problem that had occurred this week was the
copyright music that we had used , but how I had said that we had go back to
the edit final and had changed the final cut of the short film and changed the
music to our contingency music.
The quality control that we had this week was the sound
level as on final cut X we had placed a sound meter on the page and had played
the short film from beginning to end and watched the sound level meter and
every time that the meter went above 0DB it was too loud as the sound would crackle,
so we had placed the sound level down so it won't go above 0DB.