The success that
we had this week was amazing, as we were very productive this week and had
progressed a lot with the short film and did a lot with the production of the
short film. As for this week we had filmed the last scene that we had not film
during week one and had also re-shot the Bus scene due to it being too dark and
graining, this allowed us to improve the short film significantly, with the quality
and aesthetics of it. For editing wise we has successfully stitched together
the whole film with effects and transitions in placed and also have placed and
edited in the voiceover, music, dialogue and sound effects. We had also edited
in the graphics that we have placed at the beginning and at the end of the
short film.
The target for next week is the placed in the last dialogue
, and we would be re-recoding and dubbing in the sound into the short film,
this was due to a lot of sound from the cars around the area. What we also
intended to do next week is to preview and check any last details of improvement
of the short film this could be the colour correction, the sound or the
effects. After many changes and making the final cut , we will them render the
short film at 1080p at 25fps to match the cinematic that you would get out of a
film.
We had team meeting during the whole week during
the post production stage we had discussed and developed our short film and had
also talk about what shots we should re-film, We this don the re-shot say had
also had a meeting with the cast and crew during the journey to the location in
southend we had discussed to the actors about the dialogue there are going to
say and also talk the camera man to get an idea of how the scene would look
like.
The performance from the actors has been excellent
as there have followed and stuck to the script, there had also developed the
type of character there where, as we see this in the scene of Grace and Tommy ,
where Grace had a representation of being a supportive and kind person, The
director roll was great as he had directors the short film with efficiency as
he had used and planed the scene according to the day light left to match the
date and the bus scene.
After edited the max potential that we had did this
week we had viewed over the short film and analysed if the shorts and the
sequenced and fit in and after making a few adjustments we had made the short
film flow really well. The re-filming that we had also helped with the
aesthetics of the short film and improves the flow between each scene.
The problems that I had gone through this week was
the crashing on the hardware, what had happened was that the original computer
that we were working on were, had crashed as the final cut file kept crashing
as an error kept popping up. How we had resolved this was that we had
transferred the hardware and had copy over the final cut pro file to the Mac.
The quality control that we had gone through this
week was that we had only moved on to the next scene when we had a scene
completed , as we would completed all of the first scenes first and move onto
the second one. And through the production we would focus every shot by
positioning the camera in it angle and taking a picture to see if the frame was
in focus.
No comments:
Post a Comment