The success that we had this week was that we had uploaded the footage and the voice
recording that we had did to the hardware and we had placed it on editing software of final cut x, what we also did this week was that we had recoded the voice over of the short film that we had write in the screenplay. What we had also did this week was that we had edited the beginning of the short film, the middle and had started to work on the end of the film by the end of the week. We had also downloaded and placed in the non-copyright music into the timeline, what we had did during each editing stage, was that we had first stitched together the scenes, then we had added in the effects, such as the letter box effect, the colour correction, and then we had placed in the music, the sound effects and the voiceover, we had done this at every stage of putting together the scene.
The challenges that I had faced this week was not much as we had a problem with uploading the sound as the voice recorder would not connect to the Mac, this was due to the recoded being out of batteries , we had replaced them and allowed it to connect to final cut x.

The target that we have for next week is, that we would like to re-shoot some of the scene that we had reviewed and practically did not like, this was due to the lighting of the scene, what else we would like to do next week is that we would like film the rest of our short film, which would be the date scene, we would like to do this on a day after school because it would be the perfect lighting of being in the golden hour. After filming I would like to edit the rest of the short film and adding in the date scene and re-editing the news shots of the bus scene.

During editing this week, we had a meeting about the logistics for next week and the editing that we are currently doing. We had been editing on the Mac's on final cut pro and were advertising each other about the shots that we should use and were also discussing if we should adjust the shooting script, as through the viewing of the short film we had seen that that scene did not flow so well as we had discussed the changed that we should make and had used trial and error to see if the scene would flow better.

The performance that we had seen from the editor was great, as he was on time with the schedule that we did in pre-production, as he had edited the beginning and the middle of the and the end to the date that we had scheduled them to do. The directors input was supportive and about the short film and was opinioned and told the edit is the shot did not fit the film.

The contingency that we had used during this week was that in pre-production we had said that the voice over was meant to be recorded in the music department as this would have made the quality of sound more crisp, but instead where we had recoded the voice was the gallery in the media department, as this was nearby to the editing suite that we were near.

This week we had monitored the quality of video that we had recoded, as we had looked over all of shoots that we filmed to see if there were any error or faults with the shoots we had also did this with the sound recording that we did to hear if there were any errors or feedback sound.

The problems that were occurred this week was non as we were organised this week.


The quality control that we had did this week was that we had, kept a consistent flow colour corrections, what we had did is that we had kept the original shot that we had colour corrected and put the next shot side by side to match the colour correction of each shot.