Monday, 26 June 2017
Production Log 4
This week was successful.
What had happened this week was that first of all we had received our first
draft feedback on the film and it was positive and they had liked the initial
draft of the film, the only changes that we had been asked to do was the
duration of the back section to be shorter and the levels of the sounds on the
date scene. We had also been told a idea on how the first could be structured
was we had been told that what if the last sense of the short film could be
placed as the first sense, we had implied this opinion and had previewed it and
had like the outcome much better than the first structure. we then had created
the final cut of the film and liked the structure of the outcome of it and had
rendered and uploaded it at 1080p and 25fps as the standard film.
Challenges that we had
faced this week was that we had an intendent occurred the music that we had
original said that we wanted to be include into the date scene was non
copyright music we had then later seen that the music was copyright this was
show when we had seen that the YouTube notice that the music was copyrighted
and was unable to play the video so we had to go back to editing and change the
music to a non-copyright music.
We do not have a target for
next week was we have completed out short film and made the final cut of the
film and we have final the final projection of the film.
We had a team meeting
throughout this week while we were editing the final cut of the short film. We
had discussed the structure of the short film and had taken the idea of placing
the last scene first and we both had agreed that it had made the short film so
much better and it started and ended with the audience of feeling hopeful for
the character.
The team performance for this week was effective to the
short film in a positive because we had finished the final cut of the film
before the week had finished. The editor that we had was quick to make any
changes that we were told that could be improved and the director had agreed to
the improvement and had supported the idea and the editor to make the changes.
Contingency that we had used this week was that we had come
across a problem that one piece of the music that we had used was copyrighted,
so we had to go towards our contingency and replace the music. Were we had seen
this problem was when we had uploaded the cut of the film to YouTube and had
got a copyright notice.
We had previewed the short film many time to see if there
were any error with the footage, or if there was sound of a cut out of place,
we had did this throughout and had did it multiple times when we had moved the
last scene around to see if there was an error occurred. The final cut was
shown on full screen as we was going to render and uploaded it for out audience
to see.
The only problem that had occurred this week was the
copyright music that we had used , but how I had said that we had go back to
the edit final and had changed the final cut of the short film and changed the
music to our contingency music.
The quality control that we had this week was the sound
level as on final cut X we had placed a sound meter on the page and had played
the short film from beginning to end and watched the sound level meter and
every time that the meter went above 0DB it was too loud as the sound would crackle,
so we had placed the sound level down so it won't go above 0DB.
Sunday, 18 June 2017
Production Log 2
The success that we had this week was that we had uploaded the
footage and the voice
recording that we had did to the hardware and we had placed it on editing software of final cut x, what we also did this week was that we had recoded the voice over of the short film that we had write in the screenplay. What we had also did this week was that we had edited the beginning of the short film, the middle and had started to work on the end of the film by the end of the week. We had also downloaded and placed in the non-copyright music into the timeline, what we had did during each editing stage, was that we had first stitched together the scenes, then we had added in the effects, such as the letter box effect, the colour correction, and then we had placed in the music, the sound effects and the voiceover, we had done this at every stage of putting together the scene.
recording that we had did to the hardware and we had placed it on editing software of final cut x, what we also did this week was that we had recoded the voice over of the short film that we had write in the screenplay. What we had also did this week was that we had edited the beginning of the short film, the middle and had started to work on the end of the film by the end of the week. We had also downloaded and placed in the non-copyright music into the timeline, what we had did during each editing stage, was that we had first stitched together the scenes, then we had added in the effects, such as the letter box effect, the colour correction, and then we had placed in the music, the sound effects and the voiceover, we had done this at every stage of putting together the scene.
The challenges that I had faced this
week was not much as we had a problem with uploading the sound as the voice recorder
would not connect to the Mac, this was due to the recoded being out of batteries
, we had replaced them and allowed it to connect to final cut x.
The target that we have for next
week is, that we would like to re-shoot some of the scene that we had reviewed
and practically did not like, this was due to the lighting of the scene, what else
we would like to do next week is that we would like film the rest of our short
film, which would be the date scene, we would like to do this on a day after
school because it would be the perfect lighting of being in the golden hour. After
filming I would like to edit the rest of the short film and adding in the date scene
and re-editing the news shots of the bus scene.
During editing this week, we had a
meeting about the logistics for next week and the editing that we are currently
doing. We had been editing on the Mac's on final cut pro and were advertising each
other about the shots that we should use and were also discussing if we should adjust
the shooting script, as through the viewing of the short film we had seen that
that scene did not flow so well as we had discussed the changed that we should
make and had used trial and error to see if the scene would flow better.
The performance that we had seen
from the editor was great, as he was on time with the schedule that we did in
pre-production, as he had edited the beginning and the middle of the and the end
to the date that we had scheduled them to do. The directors input was
supportive and about the short film and was opinioned and told the edit is the
shot did not fit the film.
The contingency that we had used
during this week was that in pre-production we had said that the voice over was
meant to be recorded in the music department as this would have made the quality
of sound more crisp, but instead where we had recoded the voice was the gallery
in the media department, as this was nearby to the editing suite that we were
near.
This week we had monitored the quality
of video that we had recoded, as we had looked over all of shoots that we
filmed to see if there were any error or faults with the shoots we had also did
this with the sound recording that we did to hear if there were any errors or
feedback sound.
The problems that were occurred this
week was non as we were organised this week.
The quality control that we had did this
week was that we had, kept a consistent flow colour corrections, what we had
did is that we had kept the original shot that we had colour corrected and put
the next shot side by side to match the colour correction of each shot.
Production Log 3
The success that
we had this week was amazing, as we were very productive this week and had
progressed a lot with the short film and did a lot with the production of the
short film. As for this week we had filmed the last scene that we had not film
during week one and had also re-shot the Bus scene due to it being too dark and
graining, this allowed us to improve the short film significantly, with the quality
and aesthetics of it. For editing wise we has successfully stitched together
the whole film with effects and transitions in placed and also have placed and
edited in the voiceover, music, dialogue and sound effects. We had also edited
in the graphics that we have placed at the beginning and at the end of the
short film.
The target for next week is the placed in the last dialogue
, and we would be re-recoding and dubbing in the sound into the short film,
this was due to a lot of sound from the cars around the area. What we also
intended to do next week is to preview and check any last details of improvement
of the short film this could be the colour correction, the sound or the
effects. After many changes and making the final cut , we will them render the
short film at 1080p at 25fps to match the cinematic that you would get out of a
film.
We had team meeting during the whole week during
the post production stage we had discussed and developed our short film and had
also talk about what shots we should re-film, We this don the re-shot say had
also had a meeting with the cast and crew during the journey to the location in
southend we had discussed to the actors about the dialogue there are going to
say and also talk the camera man to get an idea of how the scene would look
like.
The performance from the actors has been excellent
as there have followed and stuck to the script, there had also developed the
type of character there where, as we see this in the scene of Grace and Tommy ,
where Grace had a representation of being a supportive and kind person, The
director roll was great as he had directors the short film with efficiency as
he had used and planed the scene according to the day light left to match the
date and the bus scene.
After edited the max potential that we had did this
week we had viewed over the short film and analysed if the shorts and the
sequenced and fit in and after making a few adjustments we had made the short
film flow really well. The re-filming that we had also helped with the
aesthetics of the short film and improves the flow between each scene.
The problems that I had gone through this week was
the crashing on the hardware, what had happened was that the original computer
that we were working on were, had crashed as the final cut file kept crashing
as an error kept popping up. How we had resolved this was that we had
transferred the hardware and had copy over the final cut pro file to the Mac.
The quality control that we had gone through this
week was that we had only moved on to the next scene when we had a scene
completed , as we would completed all of the first scenes first and move onto
the second one. And through the production we would focus every shot by
positioning the camera in it angle and taking a picture to see if the frame was
in focus.
Subscribe to:
Comments (Atom)

